Got the frame back from the powder coaters, very nice it is to
Satin black
First thing to go on was the new footpegs.
If they perform as well as they look I’ll be well happy.
They only thing I could moan about are the cheapo spring that comes with the kit.
I had to put a heat shrink on it and bend it over to stop it rubbing on the frame.
You can see it here (circled in red)
Call me a tart, but WTF, ally this good deserves to be polished.
Bling Bling
Got fed up waiting for my pistons rings that I ordered from Bracken, if there’s one thing I find annoying about KTM it’s the waiting for parts.
The dealerships seem to be road bike orientated and never carry any stock. It’s always got to come from Austria and will take seven days, which then turns into 3 weeks.
I suppose that’s the price we pay for having cheap spares from the manufacturer.
I phoned ET James on Friday who had all the parts I wanted in stock, they were delivered the following morning. Excellent service.
Rings installed, head back on. Gave up looking for the same type of bolt as standard (only in stainless steel) and ordered some Allen SS bolts to replace the crap KTM ones.
Checking they moose’s out I found a couple of splits in the front, not to bad just wrap some tape round and keep an eye on it. They tyre feels OK with the moose fitted.
I find the best way to fit a moose is to put one side of the tyre on the rim, put it up and stuff the moose in then push it down an lever they tyre on.
I did grease it up first.
Before doing the back tyre I took the old sprocket off (save skinning your knuckles)
Then stuck a nice new Mitas C02 on, couldn’t get it to seat properly, I’ll give it a test run before Rendelsham, that should sort it.
Stripped the throttle assembly and cleaned it all up, just got to do the front and rear brakes now. Should be done for next weekend